Will today's business buildings still work in 10 years?
The hardest thing about designing a new business premises may be imagining the people who will use it five or 10 years from now. The drawings show the doors, the parking spaces and the plant rooms. They cannot show which department will double in size, where an unexpected delivery will cause a queue, or how the building will cope when the operating hours change.
That matters in a place such as Athlone, where growth is taking different forms. Earlier this year, work was underway on the road network for a second IDA business and technology park on the Ballymahon Road. Westmeath County Council also granted permission for an extension to the Mr Price distribution centre in Cornamaddy, including changes to loading areas. Neither story is simply about putting up more walls. Both illustrate how infrastructure and working space have to accommodate what businesses need next.
There is no way to make a building future-proof in every respect. Trying would probably make it prohibitively expensive. But there are decisions worth taking before construction, particularly those that become difficult to reverse once the roof, access routes and services are in place.
Leave some room for the business you haven't imagined
A property designed around today's headcount can feel cramped long before the walls are old. The opposite is no better: a building with enormous unused spaces, costly to heat and maintain, because somebody assumed every business would grow in the same way.
Begin with what really needs to be fixed. Structural columns, loading positions and major service routes are expensive to move. Internal room arrangements may be easier to adapt if the design allows it. Think about whether an extra entrance could serve a second occupier, where additional cabling might run, and which areas would need separate heating or access arrangements if their use changed.
The small decisions add up. Leaving sensible access to a service riser might seem unimportant on a drawing, until a technician needs to open half a finished ceiling to reach it. A room labelled 'storage' might one day contain equipment that produces heat or requires closer access control. These possibilities need not dictate the whole project, but they deserve an early conversation.
It also helps to involve the people who will inherit the building. A facilities manager is likely to ask about maintenance clearances, fault isolation and records. The design team may be concentrating on programme and specifications. Neither view is wrong. You need both.
Make arriving at the site straightforward
The first few minutes on a site can tell a visitor a lot about how it operates. A customer heads towards the loading bay because it is the nearest visible door. A delivery driver stops outside reception to ask where the goods-in area is. Staff coming off an early shift cross the path of a vehicle arriving for a collection. These are avoidable frustrations, and sometimes safety risks.
The Health and Safety Authority identifies vehicle movements and the pedestrian interface among the main issues in warehouse safety. You cannot solve them with a sign alone. Safe routes need to be considered in the layout, with proper separation, visibility and arrangements for loading and unloading.
There is still a place for clear information. Good outdoor signage helps first-time visitors find reception, identifies customer parking and makes temporary changes easier to follow during building work. Printed boards or displays can be useful for these ordinary wayfinding needs, but they should not be treated as a substitute for formally specified traffic controls or safety signs.
Walk the route as somebody who has never seen the site plan. Can you find the visitor entrance from the road without turning across a delivery route? Is the sign legible in poor light? Will a new tenant or an altered one-way system make it misleading next year? A smart-looking building is not much use if somebody has to come outside and wave people in every morning.
Think about the roof while the building is still on paper
Rainwater drainage tends to be noticed when it stops working. That is understandable. Nobody visits a new business park to admire an outlet on the roof. Yet on a large building, getting rainwater away safely involves substantial pipework and coordination with the rest of the structure.
The issue is not simply how much rain a roof can collect. The designer needs to establish where it will discharge, how the pipes can be routed without interfering with other services, what happens in exceptional rainfall and how outlets will be inspected. A large, relatively flat roof can present very different problems from the pitched roof of a small retail unit.
A useful example comes from a Dublin data-centre drainage project in which a large roof was served by 435 metres of siphonic pipework and four downpipes, with the design connected to rainwater harvesting equipment. A separate, smaller roof used gravity drainage. The detail is valuable because it shows that even within one development, the sensible solution can vary according to the space and the roof's needs.
That project was in Dublin, not Westmeath, and the same design would not necessarily suit another building. The lesson is about timing. Once the structure and internal services are coordinated, changing a major drainage route can be disruptive. Getting the relevant specialists around the drawing early is often the cheaper option.
Roof drainage also has to connect to the wider surface-water strategy. A perfectly sized downpipe cannot compensate for an unsuitable discharge arrangement or poor drainage around the yard. Make sure the design team can explain the whole route the water will take, rather than treating the roof edge as the finish line.
Don't leave energy performance to a handover manual
A building may have efficient equipment and still use more energy than expected. Heating starts too early. Cooling continues after rooms empty. Two systems work against each other because they were commissioned separately. The problem is often less about buying another device and more about understanding how the existing ones operate together.
For larger sites, that is where a building energy management system becomes useful. It can bring information from heating, ventilation, cooling, lighting and meters into a form the facilities team can act upon. An approach such as Standard Control Building Energy Management Systems is relevant where these services need coordinated control rather than a collection of unrelated timers.
The practical questions are refreshingly ordinary. Who changes the schedule when a tenant starts a night shift? Can somebody see when a piece of plant has run outside its agreed hours? Are important alarms sent to a person who knows what to do with them? If the answer to every question is 'call the installer', the operating team has not really been given control.
There can be regulatory considerations too. SEAI sets out the building automation and control requirements affecting certain non-domestic buildings with sufficiently large heating, air-conditioning or ventilation systems. Whether a particular property falls within those rules should be established by the professional team, not guessed from the building's size or appearance.
For smaller premises, an expensive integrated platform may be unnecessary. Clear zoning, sensible schedules and regular reviews of utility use might achieve more than complicated software nobody opens. Buying the right level of control matters as much as the technology itself.
Give sensitive areas their own rules
The public reception and the equipment behind a locked technical door should not have identical access arrangements. This becomes especially important where a site operates around the clock, relies on outside contractors or contains equipment whose loss would interrupt critical services.
Westmeath has a current example of how substantial those facilities can be. In June, the council gave planning permission, subject to conditions, for a proposed data-centre and energy campus near Rochfortbridge. Permission is not the same as an operating campus, but the proposal helps explain why issues such as delivery access, security zones and maintenance routines are now part of the local infrastructure conversation.
For a facility of that type, data centre security solutions need to take account of more than a fence and cameras. You need to know who can pass the perimeter, which doors lead to restricted rooms, how contractors are supervised and how access is withdrawn when their work ends. An arrangement that is secure in theory but impossible for staff to follow is unlikely to stay secure for long.
A different level of protection will suit an ordinary office or a public-facing unit. The underlying discipline is the same: start with the risks and the people using the building. Don't buy advanced access controls simply because they look impressive, and don't give everyone a master credential because the exceptions are inconvenient.
Any CCTV needs its own justification and operating rules. The Data Protection Commission's guidance on workplace CCTV addresses lawful purpose, necessity, retention and the handling of footage containing identifiable people. Camera coverage must also be planned alongside safe emergency exits, not at their expense.
The day after handover matters more than the ceremony
It is surprisingly easy for the knowledge behind a new building to disappear. The contractor knows why one drainage outlet is positioned differently from another. The controls engineer knows which settings were agreed after testing. The security installer knows how temporary passes are revoked. Six months later, the people managing the property may know none of that.
Make sure the handover includes usable drawings, manuals, maintenance responsibilities, warranties and instructions for the systems that are actually installed. Test access permissions and operating schedules with the staff who will use them. Check that cleaning or inspection work can be done safely, particularly at height or in restricted technical areas.
Someone should be responsible for keeping those records current. Otherwise an extension, a tenant change or a new contractor can quietly undo the arrangements the original team spent months getting right. A good handover is not a box of documents. It is the point at which the building starts to belong to its operators.
Come back after the first winter
Before opening, agree what you will look at six months later. The list doesn't need to be elaborate. Are there recurring complaints about access or directions? Are energy bills behaving as expected once the building is occupied? Do gutters and roof outlets remain easy to inspect? Have staff begun inventing workarounds for routes that are awkward?
Seasonal changes reveal things a summer handover may miss. Rain shows where water gathers at entrances. Dark evenings expose poorly positioned signs. Occupancy changes reveal whether the heating and cooling arrangements can cope without constant manual adjustment.
These are operational observations rather than a verdict on the architects or contractors. Some adjustments will be small, and some may require specialist work. What matters is noticing them while they are still manageable, and learning from them before the next phase of development.
Westmeath's newer business sites will be judged by more than how they looked when permission was granted. Their real value will emerge in the ordinary years that follow, when people arrive for work, goods move through the doors and the building must do what it was built to do. Planning for that future is far less glamorous than a launch photograph. It is also far more useful.